Frasier Field

Owner:       City of Lynn, MA

Location:   Lynn, MA

Engineer/Architect:  CBI Consulting, Inc.

Frasier Field Stadium is one of the first concrete cantilevered stadiums in this country. It was constructed in 1938 and hosted its first game in 1941. Since then, the stadium has hosted many professional baseball teams.

The stadium became so deteriorated that a complete concrete restoration of both the stadium and the cantilevered roof and associated structural supports was required.

At the completion of all repairs, CSI installed a complete waterproofing system, which was color coordinated to accent the newly refurbished stadium.

Printer-Friendly One Page Project Summary.


 
 





 


 
BOSTON 453 South Main Street, Attleboro, MA 02703 P/ 508.222.2377  
FT LAUDERDALE 1600 N. Powerline Road, Pompano Beach, FL 33069 P/ 954.786.3223  
PORTLAND 477 Congress Street, 5th Floor, Portland, ME 04101 P/ 207.523.3431  
WASHINGTON, DC 5127 Berwyn Road, College Park, MD 20740 P/ 301-513-5226  
Air Barriers | Caulking & Sealants | Chemical & Epoxy Grouting | Concrete Repair & Restoration | Deck Coatings | Expansion Joint Systems
Exterior Wall Coatings | Masonry Restoration & Cleaning | Hydrodemolition | Historical Masonry Restoration | Site Development & Excavation
Specialty Flooring Systems | Structural Stabilization | Waterproofing Systems
© 2008 CONTRACTING SPECIALISTS INCORPORATED   all rights reserved
Web Design